Project Background
To reduce flood damage in the Clear Creek watershed, the Galveston District of the U.S. Army Corps of Engineers (USACE) has been engaged in a complete reevaluation of flood risk management opportunities along Clear Creek.

The USACE has recommended a project for Clear Creek in the past. When citizens and local sponsors asked the USACE to consider changes to the proposed project, the Agency was required to evaluate whether suggested changes fit within the scope of the Federally funded plan or if they were so significant that a complete reevaluation of the entire project was warranted. The USACE reviewed the changes in 1998. They made the judgment that suggested changes and enhancements constituted major differences in the scope of the project and that a reevaluation would be required.

A study, called a General Reevaluation Report or 'GRR', is currently underway. Three agencies representing constituents within the watershed are co-sponsoring the study: The Harris County Flood Control District, Galveston County and Brazoria Drainage District Number Four.

Progress Report
The USACE has identified the NED Alternative for the Clear Creek flood risk management Project. This alternative is the result of a comprehensive engineering, economic and environmental analysis and community input. To review the list of measures included in the Preliminary NED Alternative, please download the newsletter and presentation available below.


jump to top of pageTOP OF PAGE



 

Download Information:


Please view and print handouts outlining details of the Prelminary NED Alternative


Please view and print the presentation given to the CCWSC and CAC on September 13, 2005.