Study Team
The Clear Creek Study Team is made up of representatives of the U. S. Army Corps of Engineers,
Galveston District (USACE) and the two local sponsors: Harris County Flood Control District (HCFCD) and
Galveston County.
The Study Team meets at least monthly at the USACE offices in Galveston. The group discusses the progress
of the study, project alternatives, and the results of on-going data collection. Federal law prohibits
opening Study Team meetings to the public.
Over the past two years, the Study Team has made significant progress and has reached a number of important
project milestones. Extensive baseline data has been compiled, including:
Hydraulic/hydrologic information;
GIS mapping of:
Roads,
FEMA floodplains,
Habitat types,
Wetlands and signification biological areas,
Elevations and contours,
Stream cross-sections,
Cultural resources,
Recreational facilities,
Census information,
Structural inventory information.
Environmental baseline data for the EIS.
In the Spring of 2002, the Study team conducted two internal, all-day work sessions and developed a list
of 20 potential flood risk management measures for Clear Creek. Since that time, the Study Team has been
in the process of analyzing each of the 20 measures. This includes hydraulic/hydrologic and
“benefits-to-cost” analysis of each measure. Environmental mitigation and eco-restoration actions necessary
to offset project impacts are also being evaluated.
|

Local Sponsors
|

(Lead Sponsor)
9900 Northwest Fwy
Houston, TX 77092
713-684-4040
|
 |

P.O. Box 1229
Galveston, TX 77553
409-766-3992
|
 |

123 Rosenberg
Galveston, TX 77550
409-770-5549
|
 |

4805 West Broadway
Pearland, TX 77581
281-485-1434
|
|
 |
TOP OF PAGE |
|

 |
click on photo to enlarge
|
 |

Study Team members (Left to Right) Brett Sachtleben, Robert Van Hook, Al Flores, Kevin Shanley
and Rod Shant during the April 2002 work sessions.
|
 |

Pictured are Study Team Members (Foreground) Don Allen, Carolyn Murphy, and Andrew Labay,
(Background) Gerald Dunaway, Carol Hollaway, and Jackie Lockhart. The Study Team conducted
all-day work sessions in April 2002 and developed 20 possible flood risk management measures
for Clear Creek. These measures are currently undergoing extensive evaluation.
|
 |
|